KEBSL
Full Refurbishment | Islington, London

Renovation & Refurbishment

Full Refurbishment | Islington, London

Sector

Renovation & Refurbishment

Country

UK

Location

Islington, London

Duration

6 months

Value

£150,000–£220,000

Size

210 m²

Completed

2024

The Brief

Modernise the property's kitchen, bathrooms, and services while retaining its period character throughout.

Challenges

Existing electrical and plumbing services were original to the building and had to be fully replaced without altering protected facade elements.

Our Solution

Sequenced the refurbishment room-by-room, routing all new services through non-visible risers, and restored original joinery and cornicing alongside the modern fit-out.

Materials

  • —Engineered timber flooring
  • —Restored period joinery
  • —New M&E throughout

Trades

  • —Structural
  • —Electrical
  • —Plumbing
  • —Joinery

Gallery

Full Refurbishment | Islington, London — gallery photo 1
Full Refurbishment | Islington, London — gallery photo 2

Ready to start your project?

Tell us about your project and we'll be in touch to schedule an on-site assessment.